[1] |
WANG Wei, MEI Yadong, BAO Zhengfeng. Peak-shaving benefit model of cascade hydropower stations based on daily peak modes[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2018, 37(2): 47
-58
. |
[2] |
ZHOU Jianzhong, WU Wei, LU Peng, LI Chunlong. Short-term peak shaving of cascade hydropower stations in response to power grid load[J]. Journal of Hydroelectric Engineering, 2016, 35(6): 1
-10
. |
[3] |
HU Yi, WANG Shoudong, XU Honglei. Impact of planned development in Zhoushan new district on sea water quality[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2015, 34(8): 62
-70
. |
[4] |
CAO Liekai, Detert Martin, LI Danxun. New system for rapid measurement of indoor surface velocity fields based on feature matching velocimetry[J]. Journal of Hydroelectric Engineering, 2019, 38(11): 1
-8
. |
[5] |
JIANG Zhiqiang, WU Wenjie, QIN Hui, JI Changming, ZHOU Jianzhong. Fuzzy risk of short-term operation of hydropower stations considering runoff forecasting errors[J]. Journal of Hydroelectric Engineering, 2019, 38(2): 36
-46
. |
[6] |
CHEN Jiaqi, ZHU Quanrong, SU Zhimin, ZHOU Zhengfu, CHEN Songshan. Shaft tubular pump units based on regularized design[J]. Journal of Hydroelectric Engineering, 2019, 38(2): 101
-111
. |
[7] |
XIAO Yao, ZHONG Denghua, WANG Dong, LIN Weiwei, WANG Jiajun, LIU Zhen. Dynamic update of diversion tunnel construction simulation parameters based on ACDE-SVM[J]. Journal of Hydroelectric Engineering, 2019, 38(4): 234
-245
. |
[8] |
LIU Huan, LIAO Shengli, LIU Zhanwei, ZHANG Zheng, WU Huijun. Medium-term peak-shaving scheduling method of cascade reservoirs coupled with flow time delay[J]. Journal of Hydroelectric Engineering, 2022, 41(4): 37
-46
. |
[9] |
XIAO Boyi, ZENG Yun, DAO Fang, ZOU Yidong, LI Xiang, BAI Shufang. Voiceprint recognition model of hydropower unit rub-impact faults based on integrated EEMD-CNN[J]. Journal of Hydroelectric Engineering, 2024, 43(1): 59
-69
. |
[10] |
QIU Hongya, LI Yanqing, CHEN Lu, ZHANG Dongdong, QI Yaole. Study on patterns of flood coincidence in Dongting Lake basin[J]. Journal of Hydroelectric Engineering, 2020, 39(11): 59
-70
. |
|