[1] |
LIAN Jijian, JIAN Jiale, XU Kui, RONG Qinbiao. Optimizing regulation of Jinping II reservoir to reduce sediment deposition using unconventional flood flushing[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2018, 37(12): 44
-53
. |
[2] |
YANG Qian, LIU Dengfeng, MENG Xianmeng, HUANG Qiang, LIN Mu. Quantitative analysis of impacts of environment changes on runoff in upper Han River[J]. Journal of Hydroelectric Engineering, 2019, 38(12): 73
-84
. |
[3] |
SU Yan, FU Jiayuan, LIN Chuan, CHEN Zeqin, WENG Kailiang, ZHANG Ting. Prediction model of dam structure dynamic deformation based on time attention mechanism[J]. Journal of Hydroelectric Engineering, 2022, 41(7): 72
-84
. |
[4] |
KE Wei, XIE Ping, SANG Yanfang, WU Ziyi. Staged hydrological method based on Bai and Perron’s multiple structural breaks test[J]. Journal of Hydroelectric Engineering, 2019, 38(2): 57
-67
. |
[5] |
ZHOU Jianping, DU Xiaohu, ZHOU Xingbo, WANG Fuqiang. Research on high dams and developing trends[J]. Journal of Hydroelectric Engineering, 2019, 38(2): 1
-14
. |
[6] |
ZHANG Zhaosheng, MA Shanyu, HUANGFU Yingjie, LI Congshi, HUANGFU Zehua, ZHANG Yuming. Wireless video reservoir monitoring system based on 3D real scene modeling[J]. Journal of Hydroelectric Engineering, 2019, 38(3): 179
-185
. |
[7] |
WANG Xiaoling, LI Xiao, ZHU Xiaobin, LIU Minghui, WANG Jiajun. Reliability analysis of anti-sliding stability of a gravity dam foundation based on PLS-ELM dynamic response surface method[J]. Journal of Hydroelectric Engineering, 2019, 38(4): 224
-233
. |
[8] |
CHEN Jinhan, XIA Junqiang, LI Tiejian, WANG Miaolin. Application of digital river basin model to Long River basin of upper Yangtze[J]. Journal of Hydroelectric Engineering, 2019, 38(7): 1
-10
. |
[9] |
WANG Yimin, GAO Panxing, GUO Aijun, CHANG Jianxia, ZHAO Mingzhe. Application of Bayesian model with improved prior probability in design flood analysis[J]. Journal of Hydroelectric Engineering, 2019, 38(7): 67
-76
. |
[10] |
CHEN Hongchun, LUO Xiaofeng, YANG Xiuwei, YU Xiaodong, FAN Honggang. Influence of pipe connection between tailrace tunnels on two-stage load rejection in pumped storage power plants[J]. Journal of Hydroelectric Engineering, 2019, 38(9): 102
-110
. |
|