JOURNAL OF HYDROELECTRIC ENGINEERING ›› 2018, Vol. 37 ›› Issue (10): 103-112.doi: 10.11660/slfdxb.20181012
Previous Articles Next Articles
Online:
Published:
Abstract: This paper develops new solutions to implementing schedule-cost coordination using packages BIM and P3E/C to improve the operability and intuition of the collaborative management of hydropower projects’ schedule and cost. First, we establish correlations between the P3E/C schedule-and-cost plan data and the BIM model components, and work out a procedure for implementing asynchronous calls by combining with the P3E/C Web Service interface. Then, we analyze the expression of schedule-and-cost information modeling by the IFC standard, and develop an initialization schedule-and-cost information model through secondary development of Revit using C# language, i.e. a baseline model for network-based information collaboration. Finally, we formulate a general procedure for implementing schedule-cost collaborative management together with a technique for achieving 5D schedule-and-cost tracking and analysis functions based on BIM, thereby obtaining a visual platform of information sharing and collaborative work at different staff levels. The results show that this method provides a visualization tool for tracking construction progress and cost, collecting more intuitive decision information for project managers and leaders, and lowering the threshold of professional management software for project implementation layers.
ZHANG Sherong, PAN Fei, SHI Yueyang, XU Tong. Collaborative schedule-cost management of hydropower projects based on BIM and P3E/C[J].JOURNAL OF HYDROELECTRIC ENGINEERING, 2018, 37(10): 103-112.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.slfdxb.cn/EN/ 10.11660/slfdxb.20181012
http://www.slfdxb.cn/EN/Y2018/V37/I10/103
Cited