水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2017, Vol. 36 ›› Issue (1): 16-25.doi: 10.11660/slfdxb.20170103

• 水力发电学报 • 上一篇    下一篇

荆江典型碍航河段航道整治工程对三峡蓄水适应性分析

  

  • 出版日期:2017-01-25 发布日期:2017-01-25

Adaptability of regulation projects in Jingjiang navigation-obstructing sections to Three Gorges reservoir impounding

  • Online:2017-01-25 Published:2017-01-25

Abstract: This paper reports a study on the responses of waterway regulation projects to the Three Gorges reservoir impounding and the effects of a typical regulated navigation-obstructing section of the Jingjiang River during the impounding. Measured data of the river flow, sediment transport and topography were adopted in this study to analyze the trends of riverbed scour and deposition and the changes in waterway conditions in the regulated Yaojiang bend section after the impounding. We used a two-dimensional flow and sediment transport mathematical model to simulate this bend section and the actual effects of its guard projects and adjustable projects at an impounding stage of the reservoir following flood season. The results show that under the scour of river flow carrying little sediment at the impounding stage, the guard projects can significantly improve the waterways if certain conditions are met ? shallow waterways are in a good evolution stage and the regulation targets don’t differ much from their existing conditions. And adjustable regulation projects are needed to satisfactorily improve the conditions of those sections that are sensitive to the Three Gorges impounding stage following flood season.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn