水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2016, Vol. 35 ›› Issue (6): 102-110.doi: 10.11660/slfdxb.20160613

• 水力发电学报 • 上一篇    下一篇

水轮机运行加权因子的改进方法研究——以李家峡水电站为例

  

  • 出版日期:2016-06-25 发布日期:2016-06-25

Improvement on methods of turbine operation weighted factors. Case study of Lijiaxia hydropower station

  • Online:2016-06-25 Published:2016-06-25

Abstract: Lijiaxia hydropower station, located on the upper Yellow mainstream, has been in operation for over 15 years. However, a number of cracks appeared on the turbine runners, which has caused a serious effect on the operation efficiency, inefficient water use, and a dramatic reduction in the overall economic efficiency of this station. In this work, the weighted factors of turbine operation have been studied for the station to improve its runner operation and explore measures of runner retrofitting. We developed a statistics model for turbine operation, an improved version of this model using a comprehensive efficiency coefficient, and a ten-day electric energy balance model using turbine weighted factors. All the three models were used to examine three typical operation scenarios selected according to the long series of in-situ measurements at the station in the period of 2000-2014. The improved statistics model is recommended by comparison of the simulation results, and an order of operation efficiency priority for all the units of this hydropower station was obtained. For the schemes of turbine runner retrofitting, expected weighted factors, water level, and gains in electricity output were calculated. The results of this study are useful to economic operation of hydropower stations and turbine runner retrofitting.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn