Abstract: How to make use of efficient clean hydropower for peak-valley adjustment is a key technique to release peak regulation pressure under the circumstance of increasingly urgent demand for peak shaving. A short-term peak shaving model for cascade hydropower stations has been developed in this study considering the minimum of residual load variance. A hybrid progressive particle swarm optimization algorithm is also described herein, combining a progressive optimality algorithm (POA) in the outer layer for compressing solution space and reducing dimension with a particle swarm optimization (PSO) in the inner layer for searching continuously and randomly. To update feasible regions adaptively, a new dynamic corridor technique was used for handling complicated time-space coupling. Application of this model to four stations on the Yuan River shows that the residual load variance of Hunan Grid can be decreased by 93.6% while keeping a steady and smooth curve of residual load. The method is very effective and useful in short-term peak shaving for cascade hydropower stations.
周建中, 吴巍, 卢鹏, 李纯龙. 特约论文:响应电网负荷需求的梯级水电站短期调峰调度[J]. 水力发电学报, 2016, 35(6): 1-10.
ZHOU Jianzhong, WU Wei, LU Peng, LI Chunlong. Short-term peak shaving of cascade hydropower stations in response to power grid load[J]. Journal of Hydroelectric Engineering, 2016, 35(6): 1-10.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/10.11660/slfdxb.20160601
http://www.slfdxb.cn/CN/Y2016/V35/I6/1
Cited