水力发电学报 ›› 2016, Vol. 35 ›› Issue (5): 110-116.doi: 10.11660/slfdxb.20160513
• 水力发电学报 • 上一篇 下一篇
出版日期:
发布日期:
Online:
Published:
Abstract: In-plant economical operation is an important measure to improve the benefit of a hydropower plant. In cases where a large number of generator sets of various types are in operation, traditional methods or intelligent algorithms come up against problems, such as too much time-consuming and uncertainty in solutions. Through a case study of the large number of complex generator sets at the Xi-Luo-du hydropower plant, a practical method has been developed to achieve in-plant economical operation of generator sets, including operation schemes of how to add new generator sets and shut down some of the existing sets. Results show that our method can give solutions very close to the optimal at less computational cost. The method is fast enough to meet on-line operation needs and it would be useful to the design and operation of similar hydropower plants.
李林峰,唐海华. 溪洛渡水电站大规模机组群厂内经济运行实用化方法[J]. 水力发电学报, 2016, 35(5): 110-116.
LI Linfeng, TANG Haihua. Practical method of in-plant economical operation of Xi-Luo-Du hydropower plant with large number of generator sets[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2016, 35(5): 110-116.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/ 10.11660/slfdxb.20160513
http://www.slfdxb.cn/CN/Y2016/V35/I5/110
Cited