水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2016, Vol. 35 ›› Issue (4): 47-54.doi: 10.11660/slfdxb.20160406

• 水力发电学报 • 上一篇    下一篇

河段平滩流量估算方法及影响因素分析

  

  • 出版日期:2016-04-25 发布日期:2016-04-25

Estimation of bankfull discharge at reach scale and influence factor analysis

  • Online:2016-04-25 Published:2016-04-25

Abstract: Bankfull discharge at reach scale possibly contains the influence of various factors in a river reach and hence it is a better representative of the whole reach. This study has estimated such a bankfull discharge and the corresponding bankfull stage using a convergence method and WOL method based on morphological criteria respectively. The bankfull discharge and the convergence river length were estimated from the geometry data of the Inner Mongolia reach of the Yellow surveyed in the years of 1962, 1982, 1991, 2000, and 2004. Analysis shows that the river length for estimating the bankfull discharge at reach scale was increasing from 1962 to 2004. Other influence factors were also examined, including the definition of main channel and the averaged spacings of cross-sections and subsections. It reveals that the definition of main channel could be a significant factor in estimation of bankfull discharge.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn