水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2016, Vol. 35 ›› Issue (4): 32-40.doi: 10.11660/slfdxb.20160404

• 水力发电学报 • 上一篇    下一篇

雅砻江-金沙江-长江梯级水电站群联合调度图研究

  

  • 出版日期:2016-04-25 发布日期:2016-04-25

Combined dispatching charts of cascade hydropower stations on Yalong River, Jinsha River and Yangtze River

  • Online:2016-04-25 Published:2016-04-25

Abstract: Hydropower station operation is based on an dispatching chart. Most of the existing studies, however, are focused on the dispatching charts for a single reservoir or single cascade of reservoirs, rather than multi-cascades. This paper decribes an approach to design a combined dispatching chart for joint scheduling of all the hydropower stations in a whole basin, by combining the single-reservoir dispatching charts of all the reservoirs in its sub-basins and taking the leading reservoirs in the upper reaches of each sub-basin or sub-cascade as the main control objective. As a case study, we have considered four leading reservoirs and three sub-basins: Ertan reservoir on the Yalong River, Xiluodu reservoir and Xiangjiaba reservoir on the Jinsha River, and Three Gorges reservoir on the Yangtze River. This approach adopts a method of power output allocation and an adaptive discrete differential progressive optimality algorithm to optimize the combined dispatching chart and maximize the generating capacity of each sub-cascade and the total capacity of the whole basin hydropower system separately, by means of numerical simulations based on the historical runoff records. Its application to the system of the above three sub-basins along with the four leading reservoirs indicates that the combined dispatching chart significantly improves the power generation benefit of this hydropower system while guaranteeing the power output of each sub-cascade.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn