特约论文:高填方地基工后沉降计算

  

  • 出版日期:2016-03-25 发布日期:2016-03-25

Computational method for post-construction settlement for high-fill embankments

  • Online:2016-03-25 Published:2016-03-25

Abstract: Owing to their great height and large volume, high-fill embankments are subject to differential settlement that often reduces their safety and stability, and therefore the post-construction settlement of such embankments should be examined carefully. This paper develops a practical creep calculation method based on the finite element method for calculation of post-construction settlement by a time-dependent UH model and the simplified one-dimensional creep deformation computation method that could be combined with the layer-wise summation method. Field observation data collected at the Chengde airport are used to verify this method. Comparison of the calculations and field data shows that new method is able to achieve reliable predictions of post-construction settlement and hence to provide useful guidance for the following construction of the airport.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn