水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2016, Vol. 35 ›› Issue (2): 37-44.doi: 10.11660/slfdxb.20160204

• 水力发电学报 • 上一篇    下一篇

梯级水库调度的发电–生态效益均衡分析

  

  • 出版日期:2016-02-25 发布日期:2016-02-25

Hydropower-ecologic benefits tradeoff analysis of cascade reservoir operation

  • Online:2016-02-25 Published:2016-02-25

Abstract: Operation of cascade reservoirs involves multiple objectives including flood control, hydropower generation and ecosystem protection, and environmental flow demand is usually an important constraint if the major objective is hydropower generation. In this paper, we develop a cascade reservoir operation model for hydropower-environmental flow tradeoff analysis, via a case study of the Lancang River cascade, i.e., the Nuozadu, Jinghong and Ganlanba reservoirs. The results show that an obvious competitive relationship exists between maximization of hydropower generation and minimization of environmental flow alteration ? the more hydropower generation the more alteration of environmental inflow, and vice versa. This relationship is characterized by fairly strong nonlinearity. When alteration index ε is in the range of 0.3 to 0.4, a small change in ε can result in a significant change in hydropower generation, thus showing the importance role of this sensitive window in balance between hydropower generation and biological demand. Moreover, relative to the natural river flow, hydropower operation changes the frequencies of high flow pulses and small floods, which can be improved by an operation rule of artificial flood release.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn