水力发电学报 ›› 2016, Vol. 35 ›› Issue (1): 118-123.doi: 10.11660/slfdxb.20160115

• 水力发电 • 上一篇    下一篇

基于均匀设计的地下洞室群施工进度仿真多因素敏感性分析

  

  • 出版日期:2016-01-25 发布日期:2016-01-25

Multi-factor sensitivity analysis of underground powerhouse construction simulation using uniform design

  • Online:2016-01-25 Published:2016-01-25

Abstract: Construction speed is a key issue to underground powerhouse construction management. In prediction of underground powerhouse construction speed using system simulation, there are many parameters whose small variation in value may lead to a great change in construction speed. Previous studies have been limited to sensitivity analysis only on a few main factors. An underground powerhouse construction simulation model, however, usually incorporates so many construction-disturbing factors that the traditional approach is unable to meet the requirements of multi-factor analysis. This article presents a multi-factor sensitivity analysis of underground powerhouse construction simulation using the uniform design method. We have analyzed the effects of various simulation parameters on construction speed and screened the susceptibility factors. This method was adopted in a simulation model of underground powerhouse construction speed for hydroelectric power stations, and the results show that the method is able to handle the multi-factor sensitivity analysis efficiently and accurately identify those susceptibility factors that have significant effect on construction. Thus, our method would lay a theoretical basis for evaluation and optimization of the simulation model parameters and construction speed of relevant practical projects.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn