水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (10): 60-69.doi: 10.11660/slfdxb.20151008

• 水力发电 • 上一篇    下一篇

梯级水库集中调度发电效益考核评价研究 ——以乌江梯级水库为例

  

  • 出版日期:2015-10-25 发布日期:2015-10-25

Assessment of power-generating benefits from cascade reservoirs integrated operation —A case study of Wu River cascade reservoirs

  • Online:2015-10-25 Published:2015-10-25

Abstract: Along with the emergence of joint operation situations in a cascade reservoir system, the current assessment method of reservoir power generation is unable to meet the needs of economic operation, and the assessment of jointly-operated complex systems is more difficult. To overcome the limitations of traditional methods, this paper presents a method of potential optimization assessment that uses an optimal operation model to calculate the power output and its completion rate for cascade reservoirs, and considers model constraints by the main factors of power output. Combing this method with traditional assessment, we have achieved a comprehensive assessment of cascade reservoirs, i.e. assessing the existing situation and guiding the future operation. In a case study of the Wu River cascade system, its current comprehensive operation level is assessed by a traditional method and our new method. The results show that this system has excellent operation levels and the major factors of its power generation are runoff, runoff forecasting, and power network stability. The assessment results are comprehensive and objective and provide a technical support to the Wu River cascade in operation level improvement, water-saving, and power output growth in the future.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn