水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (8): 52-61.doi: 10.11660/slfdxb.20150807

• 水力发电 • 上一篇    下一篇

水电站水库分期调度图研究

  

  • 出版日期:2015-08-25 发布日期:2015-08-25

Study on staged reservoir operation chart of hydropower station

  • Online:2015-08-25 Published:2015-08-25

Abstract: To increase power output of hydropower plants, a staged operation chart is presented in this paper to better represent the output capabilities in different seasons. We elaborate a basic principle and drawing method of the staged chart, and determine the hydrologic year, high-flow season, and low-flow season of the study catchment. Then, an optimal operation model is developed to maximize the total power output of the cascaded hydropower plants. Finally, we test this chart method via a case study of the cascaded plants on the Datong River. Results show that the staged operation chart is better than the routine operation chart and could provide a new way for the operation of hydropower plants.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn