水力发电学报 ›› 2015, Vol. 34 ›› Issue (7): 80-87.doi: 10.11660/slfdxb.20150710
• 水力发电 • 上一篇 下一篇
出版日期:
发布日期:
Online:
Published:
Abstract: Considering the tradeoff between conflicting objectives in a water conservancy project in uncertain environment is a difficult task. We present two new piecewise functions, a double exponential function and a quadratic function, to simulate the relationship between the construction quality and limit time of a project, and then develop a fuzzy multi-mode discrete time-cost-quality tradeoff model for water conservancy projects. This model solves a NP-hard problem and adopts a Particle Swarm Optimization algorithm to obtain the optimal solutions. Comparison of the calculations with previous studies verifies the model and its calculation method. A case study of a water conservancy project is given, and the optimization results lay a theoretical basis for project planning and construction scheduling.
关宏艳,李宗坤,王娟,葛巍. 水利工程模糊多模式工期-成本-质量均衡优化[J]. 水力发电学报, 2015, 34(7): 80-87.
GUAN Hongyan,LI Zongkun,WANG Juan,GE Wei. Fuzzy multi-mode time-cost-quality tradeoff optimization in water conservancy project[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2015, 34(7): 80-87.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/10.11660/slfdxb.20150710
http://www.slfdxb.cn/CN/Y2015/V34/I7/80
Cited