Abstract: This paper describes a risk analysis method dividing project construction period into several major phases and each phase into several time spans based on the construction schedule and project features. By calculating the risk degree of construction items and allocating them to each phase and time span, we obtain three indicators, i.e. overall risk degree, average risk degree, and key projects, for each phase and time span to control the risk characteristics of the project. Example analysis shows that the method is effective and feasible.
李宗坤,张亚东,宋浩静,关宏艳. 基于施工进度计划的建设工程施工期风险分析[J]. 水力发电学报, 2015, 34(6): 204-212.
LI Zongkun, ZHANG Yadong, SONG Haojing, GUAN Hongyan. Risk analysis of project construction period based on construction schedule[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2015, 34(6): 204-212.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/
http://www.slfdxb.cn/CN/Y2015/V34/I6/204
Cited