水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (6): 35-40.

• 水力发电 • 上一篇    下一篇

水库调度图优先控制线优化方法研究

  

  • 出版日期:2015-06-25 发布日期:2015-06-25

Study on optimization method of priority control line on reservoir operation curve

  • Online:2015-06-25 Published:2015-06-25

Abstract: Water resources system has various functions that influence or restrict each other. To coordinate the conflicts between different beneficial goals of a reservoir, we developed a method how to add a line of priority control to reservoir operation curve and applied it in a case study of Hunanzhen cascade reservoirs. In the application, the control line was used to direct the reservoir manager's decision to put the priority on water supply or power generation to reconcile the conflicts between the water demands by Hunanzhen and the reservoirs. A mathematical model for optimization of reservoir operation under priority line control was developed and solved with an immune evolutionary particle swarm optimization. The results show that it can improve the comprehensive benefits via reasonable priority decision in reconciling various water demand conflicts.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn