水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (6): 28-34.

• 水力发电 • 上一篇    下一篇

多年调节水库年末控制水位多目标预测模型研究

  

  • 出版日期:2015-06-25 发布日期:2015-06-25

Study on multi-objective prediction model for year-end water level of carryover storage reservoir

  • Online:2015-06-25 Published:2015-06-25

Abstract: Based on the relationship between annual power generation and year-end energy storage, a multi-objective prediction model for the optimal year-end water level of carryover storage reservoir is developed, which gives a full consideration to maximizing the hydro energy and least output of the hydro plant at such a reservoir. The model was validated with the case of Longyangxia reservoir on the upper Yellow, and the essence in obtaining its optimal year-end level was revealed through analysis of the impacts of water inflow and year-start level on this optimal level. The operation results simulated by the model are further compared with the prototype operation case of this reservoir from 1990 to 2012. This shows that since 2006 it has run at a higher level than before 2006, which improves its own benefits and indicates that the multi-objective model is reasonable and feasible.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn