水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (5): 72-79.

• 水力发电 • 上一篇    下一篇

带上游串联双调压室电站水力-调速系统稳定性的研究

  

  • 出版日期:2015-05-25 发布日期:2015-05-25

Study on stability of waterpower-speed control system for hydropower station with two upstream series surge chambers

  • Online:2015-05-25 Published:2015-05-25

Abstract: Installation of two upstream series surge chambers is a significant and feasible measure for peak pressure control. This paper presents a study on the stability of waterpower-speed control system for hydropower station with such a measure. For this system, we developed a complete mathematical model including diversion pipeline, surge chamber, hydraulic turbine, speed governor, and generators, and derived a comprehensive transfer function and linear homogeneous differential equation that describe the system's dynamic characteristics. The effects of fluid inertia in water diversion system and the surge chamber parameters on stability conditions are also analyzed in this paper using stability domains. The main conclusions are as follows. When the control system reaches the same stability domain as that with one upstream surge chamber, the total cross-sectional area of the two chambers is greater than that of one chamber. If the second chamber or the one closer to the plant is smaller, a greater total area is required to reach the same stability domain. The smaller the ratio of pipe flow water inertia between the two chambers over that between the pipe intake and second chamber, the smaller the difference between the total cross-sectional area of two chambers and that of one chamber system.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn