《水库调度设计规范》中时历法编制发电调度图的改进研究

  

  • 出版日期:2015-05-25 发布日期:2015-05-25

Improvement on power generation scheduling charts of chronological series method in Design for Operation of Reservoirs

  • Online:2015-05-25 Published:2015-05-25

Abstract: A scheduling chart of power generation, if designed by the specifications Design for Operation of Reservoir, usually has unreasonable points that cannot be removed even by repeated testing and modification. This article presents an improvement method and measures for eliminating such points and modifying the method recommended in the specifications. This new method adopts successive calculation of long series and unifies the calculations of one-year regulation and multi-year regulation of a reservoir. It can calculate the lower power output curve accurately and avoid the overlap between low output area and guarantee output area, improving the accuracy of power generation scheduling curves. Application to actual projects indicates that the method improves power generation scheduling chart in meeting different requirements of low output and firm output. The chart can be completed in one-time success with no need for repeated testing and modification and meet the reliability requirement of power design.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn