水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (5): 35-43.

• 水力发电 • 上一篇    下一篇

跨流域调水条件下水库群联合调度图概化降维方法研究

  

  • 出版日期:2015-05-25 发布日期:2015-05-25

Simplification method of deriving joint operating rule curves for multi-reservoir operation

  • Online:2015-05-25 Published:2015-05-25

Abstract: Inefficiency and counter-intuitive results are often generated by using optimization algorithm alone for deriving joint-operation rule curves of large-scale multi-reservoirs. This paper describes a simplification method for deriving the rule curves via a case study of the north-line inter-basin water transfer-supply project in Liaoning Province, China. The framework of this new method was derived by considering three aspects: the basic pattern of conventional hedging rule curves for major water users of aggregation reservoirs, the mean period distribution of water surplus and shortage, and the heuristic information including operation experiences and laws. Then, we developed an optimization-simulation model using this new method. The results show that the method brings about an easier searching of optimal solution in optimization algorithm and improves rationality and practicability of joint rule curves.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn