水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (4): 177-183.

• 水力发电 • 上一篇    下一篇

DBB模式下施工总承包合同双方信任状态描述—基于内容分析的访谈研究

  

  • 出版日期:2015-04-25 发布日期:2015-04-25

Describing trust state of construction general contracting parties under DBB mode based upon study of interview and content analysis method

  • Online:2015-04-25 Published:2015-04-25

Abstract: Previous studies suggest that trust is a key factor in success of construction projects, and how to describe the trust state between the owner and contractor of a construction project is a very important part of project implementation. This paper summarizes the previously reported key events that represent trust in the DBB mode, and recognizes grips that can measure trust state using the data of interviews and a content analysis method, focusing on clarification of the contract parties' behaviors of trust state. Based on this, we develop a dynamic elevation model of owner-contractor trust state for the overall process of a construction project. The results have shown that the trust grips, as a measure of trust state, can help contacting parties understand better the partner's trust level and judge the effectiveness of various measures for improving the trust state, thus promoting the probability of project success.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn