无穷大电网下带超长引水隧洞的水电站小波动过渡过程研究

  

  • 出版日期:2015-04-25 发布日期:2015-04-25

Study on small-fluctuation transient process in long diversion tunnel of hydropower station on infinite power grid

  • Online:2015-04-25 Published:2015-04-25

Abstract: For a hydropower station with long-distance diversion tunnel, extremely large inertia of the tunnel flow leads to long fluctuation cycles, large amplitudes and slow decay of the water level in its surge tank. For those stations on an isolated grid, the regulation quality of transient process in small fluctuations using the traditional PID control law is poor and the fluctuations decay slowly. In this case, the cross-sectional area of surge tank often needs to be increased to improve stability, resulting in a higher project cost. If the stations connect to an infinite power grid, however, no previous studies on their stability and regulation quality are available. This paper constructs a detailed simulation model of hydraulic-mechanical-electric systems on infinite power grid, using the platform of Matlab software and its toolbox of Simulink and SimPowerSystems. This model is used to study the stability and regulation quality of hydropower stations with long diversion under small fluctuations. The results lay a basis for design and operation control of such hydropower stations.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn