广州抽水蓄能电站A厂过渡过程仿真计算分析

  

  • 出版日期:2015-03-25 发布日期:2015-03-25

Simulation and analysis of transient process for Guangzhou pumped storage power plant A

  • Online:2015-03-25 Published:2015-03-25

Abstract: The working condition of pumped storage power station is complicated, and its frequent working-mode conversion leads to severe pressure fluctuations in the pipeline and badly-deteriorated flow performances. Vibrations are a significant factor in the safe operation of units, especially more serious at the stages of start-up, shutdown, and load rejection. For the Guangzhou pumped storage power station plant A, we have calculated the variations in pipe pressure using a one-dimensional numerical method, and compared the calculations of pressure at spiral case outlet and rotation speed, etc. with its test data of transient processes in typical conditions. A three-dimensional numerical model was developed and applied to simulations of axial hydraulic thrust at different guide vane openings, focusing on analysis of the start-up and shutdown stages of power generating operation.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn