水力发电学报 ›› 2015, Vol. 34 ›› Issue (3): 145-149.

• 水力发电 • 上一篇    下一篇

土石坝建设期漫坝风险分析

  

  • 出版日期:2015-03-25 发布日期:2015-03-25

Risk analysis of overtopping during the construction period of earth-rock dam

  • Online:2015-03-25 Published:2015-03-25

Abstract: Risk of overtopping during the construction period of earth-rock dam is not only controlled by flood level, but also by the top elevation of water retaining structure. With these two factors simulated by Monte-Carlo simulation, their distributions have been determined via analysis on the uncertainties in hydrologic and hydraulic factors and the uncertainties of construction progresses, the overtopping risk for each stage and the integrated overtopping risk have been calculated using a mathematical model that was developed for calculation of different water diversion stages. The case study shows that the uncertainties of construction progresses have significant effects on overtopping risk during the construction period of earth-rock dam, the calculation methods and models are practicable.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn