Abstract: Risk of overtopping during the construction period of earth-rock dam is not only controlled by flood level, but also by the top elevation of water retaining structure. With these two factors simulated by Monte-Carlo simulation, their distributions have been determined via analysis on the uncertainties in hydrologic and hydraulic factors and the uncertainties of construction progresses, the overtopping risk for each stage and the integrated overtopping risk have been calculated using a mathematical model that was developed for calculation of different water diversion stages. The case study shows that the uncertainties of construction progresses have significant effects on overtopping risk during the construction period of earth-rock dam, the calculation methods and models are practicable.
李宗坤,葛巍,王娟1,赵海培,关宏艳. 土石坝建设期漫坝风险分析[J]. 水力发电学报, 2015, 34(3): 145-149.
LI Zongkun, GE Wei, WANG Juan, ZHAO Haipei, GUAN Hongyan. Risk analysis of overtopping during the construction period of earth-rock dam [J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2015, 34(3): 145-149.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/
http://www.slfdxb.cn/CN/Y2015/V34/I3/145
Cited