水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (3): 129-136.

• 水力发电 • 上一篇    下一篇

白鹤滩水电站坝基加固方案评价

  

  • 出版日期:2015-03-25 发布日期:2015-03-25

Dam foundation reinforcement analysis of Baihetan hydropower station

  • Online:2015-03-25 Published:2015-03-25

Abstract: Baihetan hydropower station with an installed capacity more than 10,000MW is the third largest hydropower station in China after the Three Gorges project and Xiluodu project. At its dam site have developed columnar jointed rocks that are anisotropic materials with lower mechanical strengths. To reduce the negative influence of these rocks and faults a reinforcement scheme was proposed for stability and security of the dam. Based on the geological data, an accurate three-dimensional numerical model was developed, and a transversely isotropic elastic-plastic constitutive model was adopted for describing the mechanical behaviors of columnar jointed rocks. This paper discusses the influence of anistropy using the simulations by the transversely isotropic constitutive model and the isotropic constitutive model, and presents a comparative analysis on deformation and stress distributions in the dam and foundation in the schemes of reinforcement and no reinforcement. And the overall stability of dam-foundation is evaluated by using water pressure overload method. This study provides a technical support to the final-stage feasibility study on Baihetan hydropower station.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn