水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (3): 21-28.

• 水力发电 • 上一篇    下一篇

新一代三峡水利枢纽短期洪水预报系统的构建与检验

  

  • 出版日期:2015-03-25 发布日期:2015-03-25

Development and validation of next generation short-term flood prediction system for Three Gorges project

  • Online:2015-03-25 Published:2015-03-25

Abstract:  

In this paper we introduce the design and implementation of a next generation short-term flood prediction system for the Three Gorges project. This prediction system is able to take multiple sources of rainfall data as inputs, and applies a distributed geomorphology-based hydrological model (GBHM) to simulation of rainfall-runoff processes. It is believed that by taking account the heterogeneity of land-use and soil types into the hill-slope hydrological processes, the GBHM performs better in reproducing spatiotemporal patterns of hydrologic variables. For the flood routing in the Three Gorges reservoir, MIKE11 model is coupled to simulate the hydrodynamic processes in the Yangtze mainstream across the reservoir. The evaluation results based on historical data shows that this new generation prediction system can capture the hydrological responses accurately, including the floods generated in the Three Gorges region, and the floods routing in the reservoir.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn