水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (2): 199-206.

• 水电工程管理及其他 • 上一篇    

一种基于AHP的网络计划工期优化方法

  

  • 出版日期:2015-02-25 发布日期:2015-02-25

AHP-based schedule compression method for network planning

  • Online:2015-02-25 Published:2015-02-25

Abstract: Schedule compression is commonly needed in construction management. Currently, a wide range
of methods for schedule compression have been developed in the literature. Almost all these methods
consider only cost in the process of determining optimal sequence for activities. But in fact, other factors
beyond cost in schedule compression, such as resource availability, risk, and complexity, should have been
attributed to the limited use of existing methods. This paper presents a new method for schedule compression
of construction projects using an analytical hierarchy process (AHP). This method adopts a multi-objective
decision environment in which activities are queued for crashing based on the preferred coefficient
calculated by considering resource, risk, and cost. Finally, an example is analyzed to demonstrate the specific
optimization procedure. In comparison with the traditional methods, a more objective, comprehensive and
accurate preferred coefficient can be achieved, which gives decision makers better optimization solutions to
meet the actual needs.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn