水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (2): 189-194.

• 水力机械与电气设备 • 上一篇    下一篇

基于二次反调节作用的水电站调峰潜力研究

  

  • 出版日期:2015-02-25 发布日期:2015-02-25

Study on peaking capacity of cascade hydropower stations under reservoir anti-regulation

  • Online:2015-02-25 Published:2015-02-25

Abstract: A calculation model for hydro plant peaking capacity under reservoir anti-regulation was
developed on the basis of previous assessment criteria of the peaking capacity to provide a guide for peaking
operation of yearly regulation reservoirs and higher generation benefits under time-of-use (TOU) power
price. In application of this model to the cascade hydro plants on Blackwater River, the peaking capacity of
the Maoergai hydro plant was evaluated in the conditions of implementing an anti-regulation at the Seergu
hydro plant and a second anti-regulation at the Liuping hydro plant. This simulation indicates that the
anti-regulation scheme efficiently improves utilization of water power resource and hydro plant benefits and
the model proves to be reasonable and applicable.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn