水力发电学报 ›› 2015, Vol. 34 ›› Issue (2): 189-194.
• 水力机械与电气设备 • 上一篇 下一篇
出版日期:
发布日期:
Online:
Published:
Abstract: A calculation model for hydro plant peaking capacity under reservoir anti-regulation was developed on the basis of previous assessment criteria of the peaking capacity to provide a guide for peaking operation of yearly regulation reservoirs and higher generation benefits under time-of-use (TOU) power price. In application of this model to the cascade hydro plants on Blackwater River, the peaking capacity of the Maoergai hydro plant was evaluated in the conditions of implementing an anti-regulation at the Seergu hydro plant and a second anti-regulation at the Liuping hydro plant. This simulation indicates that the anti-regulation scheme efficiently improves utilization of water power resource and hydro plant benefits and the model proves to be reasonable and applicable.
李基栋,黄炜斌,徐廷兵,等. 基于二次反调节作用的水电站调峰潜力研究[J]. 水力发电学报, 2015, 34(2): 189-194.
LI Jidong, HUANG Weibin,et al . Study on peaking capacity of cascade hydropower stations under reservoir anti-regulation[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2015, 34(2): 189-194.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/
http://www.slfdxb.cn/CN/Y2015/V34/I2/189
Cited