水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (2): 112-117.

• 水力学、水环境与泥沙研究 • 上一篇    下一篇

窄缝式消能工在多洞联合泄洪中的应用研究

  

  • 出版日期:2015-02-25 发布日期:2015-02-25

Study on application of slit-bucket energy dissipater to multi-tunnel combined spillways

  • Online:2015-02-25 Published:2015-02-25

Abstract: The Changheba hydropower station is typical of high head and large capacity of multi-tunnel
combined discharge with flip-bucket energy dissipaters that require a great capacity of the downstream river
channel in energy dissipation and anti-scour. Large-scale hydraulic model tests have been conducted to solve
the problems of insufficient energy dissipation and poor condition of nappes plunging into river at the initial
stage. For slit-bucket and constant-width flip bucket, we compared their effects of energy dissipation and
anti-scour on the second spillway in the conditions of individual operation and combined operation, and
verified the advantages of combined slit-bucket and flip bucket for multi-tunnel combined operation. The
results are useful for design of similar energy dissipation and anti-scour structures.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn