水力发电学报 ›› 2015, Vol. 34 ›› Issue (2): 23-30.
• 水文水资源、水电规划及动能经济 • 上一篇 下一篇
出版日期:
发布日期:
Online:
Published:
Abstract: This paper presents a method for real-time dynamic control of flood limited water level for the Qing River cascade reservoirs. In this method, we developed a weather forecasting model for forecasting the flood process in future three days, then an optimal-operation-curve model using a genetic algorithm for optimization of long-term reservoir operation and a binary Copula-SAR stochastic model to simulate the long-term behaviors of runoff. Finally, a real-time optimal operation model was constructed using an aggregation-disaggregation approach to dynamic control flood limited water level for cascade reservoirs and considering the rules for coupling long-term and short-term operations, and an optimal algorithm POA was adopted to solve the model. The results show that the real-time dynamic control with long-term operation rules can generate extra power outputs of 0.059 and 0.314 billion kW·h (increases by 6.2% and 45.1%) relative to those without coupling long-term operation rules and in design operation, respectively.
周研来, 郭生练,段唯鑫,等. 梯级水库汛限水位动态控制[J]. 水力发电学报, 2015, 34(2): 23-30.
ZHOU Yanlai, GUO Shenglian, et al. Dynamic control of flood limited water level for cascade reservoirs[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2015, 34(2): 23-30.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/
http://www.slfdxb.cn/CN/Y2015/V34/I2/23
Cited