水力发电学报 ›› 2015, Vol. 34 ›› Issue (1): 220-228.
• 水电工程管理及其他 • 上一篇 下一篇
出版日期:
发布日期:
Online:
Published:
Abstract: This paper presents a relay chain network technology to consider mutual cooperation, cross construction, and resource allocation between working processes in the network plan, on the basis of the relay chain theory, relay chain seamless handover technology, and network planning technique. This technology can make activity handover conduct smoothly, optimize the resources allocation, and improve project quality in ensuring the duration. Its construction of relay chain network, relay-potential calculation, activity handover process, and critical path algorithm, are systematically elaborated. Its application to concrete construction duration and quality control in the third phase of the Three Gorges project has achieved a completion of the dam block A all reaching the design dam top elevation in advance to the planned duration, creating a construction miracle of concrete dam without a crack.
王 博, 周厚贵,李智勇. 接力链网络技术及其应用[J]. 水力发电学报, 2015, 34(1): 220-228.
WANG Bo,ZHOU Hougui, et al. Relay chain network technology and its application[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2015, 34(1): 220-228.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/
http://www.slfdxb.cn/CN/Y2015/V34/I1/220
Cited