水力发电学报 ›› 2015, Vol. 34 ›› Issue (1): 215-219.
• 水力机械与电气设备 • 上一篇 下一篇
出版日期:
发布日期:
Online:
Published:
Abstract:
Installed capacity is an important indicator of a hydropower station, its scale directly related to the energy efficiency, efficiency of water resources use, and rational utilization of equipments and investment etc. The factors of installed capacity are not the same for hydropower stations of different regulation performances. This paper divides hydropower stations into two types, good regulation performance and limited regulation performance. A general procedure and the existing issues in the practical work of making choices for the stations of different performances are discussed, proceeding from the factors influencing the choices of installed capacity. Through the analysis of examples, confirmed the correctness of the factors in this paper, which provided a reference for the choices of installed capacity. Last, this paper suggests that it is necessary to expand the installed capacity of the existing hydropower stations timely but this should depend on the timing.
陈小兰,张 东. 水电站装机容量选择探讨[J]. 水力发电学报, 2015, 34(1): 215-219.
CHEN Xiaolan, ZHANG Dong. Investigation on choices of installed capacity for hydropower stations[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2015, 34(1): 215-219.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/
http://www.slfdxb.cn/CN/Y2015/V34/I1/215
Cited