水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2015, Vol. 34 ›› Issue (1): 207-214.

• 水力机械与电气设备 • 上一篇    下一篇

多机组泵站侧向进水特性模拟和改进研究

  

  • 出版日期:2015-01-25 发布日期:2015-01-25

Numerical simulation and improvement of side-intake characteristics of multi-unit pumping station

  • Online:2015-01-25 Published:2015-01-25

Abstract:

In one side-intake pumping station, unfavorable flow patterns in its forebay and sump existed, harming the operation of its pump units. CFD simulations by a commercial code revealed large-scale recirculations in sumps No.1~No.10 and water whirls along the semicircular back wall. To control these unfavorable flows, three sets of flow-control devices were installed in the sump. By CFD analysis and comparison of these control schemes, an effective scheme is to install diversion piers, a straight baffle plate, and two upright columns in the sump. As a result of this scheme, the large-scale recirculations disappear, the cross-sectional distribution of axial velocity in the sump is uniform with an increase of 3%~11% in flow uniformity, and the flow whirls around the back wall are also suppressed. The flows into all the suction pipes are distributed uniformly and symmetrically. This work would be applicable to intake sumps of similar pumping stations.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn