水力发电学报 ›› 2015, Vol. 34 ›› Issue (1): 17-22.
• 水文水资源、水电规划及动能经济 • 上一篇 下一篇
出版日期:
发布日期:
Online:
Published:
Abstract:
This article points out problems in the unreasonable methods recommended in Specifications on water conservancy computation of hydroelectric projects DL/T-5105-1999 for the calculations of runoff regulation and water power of hydropower stations, and suggests ideas for improvement on these methods. It is demonstrated that the improved method can avoid or correct the unreasonableness in method classification, low accuracy in calculation, and indeterminacy in conditions simplifications, etc. The improved method has been verified via application to a number of projects and its calculations are reasonable and more accurate. It could give more firm power output in comparison with the conventional method.
王 平. 水电工程径流调节和水能计算的改进时历法[J]. 水力发电学报, 2015, 34(1): 17-22.
WANG Ping . Improved chronological series method for calculations of runoff regulation and water power of hydroelectric projects[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2015, 34(1): 17-22.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/
http://www.slfdxb.cn/CN/Y2015/V34/I1/17
Cited