水力发电学报 ›› 2014, Vol. 33 ›› Issue (6): 274-282.
• 水电工程管理及其他 • 上一篇 下一篇
出版日期:
发布日期:
Online:
Published:
Abstract: Traditional schedule risk analysis methods often neglect the effects of two correlations between risk factors and between activities, and they are unable to analyze risk sensitivity of a project and its activities. A schedule risk analysis method considering these two kinds of correlations is presented herein. This method focuses on risk factor states and considers the interaction between correlated risk factors, and it calculates the distribution of project duration through stochastic modeling of risk factor states. To analyze schedule risk, a simulation program named C-NETSIMU of the new method has been coded with C# and its application to a project case is demonstrated. The calculations are compared with those by PERT and Monte Carlo techniques, which verifies the new method and shows the effects of the two correlations.
王仁超,田 钰,陈建友. 考虑两类相关性的进度风险分析方法研究[J]. 水力发电学报, 2014, 33(6): 274-282.
WANG Renchao, TIAN Yu, CHEN Jianyou . Study on schedule risk analysis method considering two kinds of correlations[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2014, 33(6): 274-282.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/
http://www.slfdxb.cn/CN/Y2014/V33/I6/274
Cited