水力发电学报 ›› 2014, Vol. 33 ›› Issue (6): 30-38.
• 水文水资源、水电规划及动能经济 • 上一篇 下一篇
出版日期:
发布日期:
Online:
Published:
Abstract: To improve the calculation accuracy of design flood for long return period, this paper studies application of high-order L-moments to flood frequency analysis, focusing on Monte-Carlo simulations for statistical properties of the L-moments method and its influences on the return period flood quantile. Parameters of GEV distribution and high-order L-moments were estimated for five annual maximum flow series observed in Shaanxi province, and the fitting effect and calculation error of flood quantile evaluated. The results show that this method has good statistical performance in flood analysis of long return period and it gives a representation of the data series better than the lower-order methods.
王俊珍,宋松柏. 基于高阶线性矩法的洪水设计值研究[J]. 水力发电学报, 2014, 33(6): 30-38.
WANG Junzhen, SONG Songbai . Application of high-order L-moments to flood quantile estimation[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2014, 33(6): 30-38.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/
http://www.slfdxb.cn/CN/Y2014/V33/I6/30
Cited