水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2022, Vol. 41 ›› Issue (6): 65-77.doi: 10.11660/slfdxb.20220607

• • 上一篇    下一篇

南水北调东线工程江苏段中长期优化调度研究

  

  • 出版日期:2022-06-25 发布日期:2022-06-25

Study on medium and long-term optimal dispatching of Jiangsu section of Estern Route of South-to-North Water Transfer Project

  • Online:2022-06-25 Published:2022-06-25

摘要: 在南水北调东线工程主要水源中长期来水预报精度不高且预见期有限的情况下,对调水系统进行科学调度和滚动决策是江苏段综合效益能否充分发挥的关键。本文提出了基于余留期调度成本函数的两阶段随机优化调度方法,在考虑预报不确定性条件下实现工程的中长期滚动调度决策。首先分析各工程单元调度运行规则,基于水量平衡原理提出系统调水成本计算方法;然后分析主要水源历史来水规律,建立余留期成本函数定量表示余留期调水成本;最后针对不同来水条件分别建立两阶段决策模型,滚动生成中长期水量调度方案。结果表明,两阶段决策模型能够克服中长期预报不确定性对调度决策的不利影响,通过多水源互济互调、水源和线路选择有效降低调水成本。

关键词: 不确定性, 跨流域调水, 两阶段决策, 中长期调度, 余留期成本

Abstract: For the Eastern Route of the South-to-North Water Diversion Project, the prediction accuracy of its medium and long-term water inflows from the major water sources is not high enough, and the forecast period is limited. Under this circumstance, how to conduct scientific scheduling and rolling decision-making for such a complex systems is the key to a full realization of the comprehensive benefits of the Jiangsu section of this route. This paper presents a new two-stage stochastic optimization scheduling method based on a residual period scheduling cost function, which can realize a medium and long-term rolling scheduling decision for the project under the condition of forecast uncertainty. First, we examine scheduling operation rules for each project unit, and work out a calculation method of system water transfer cost by the principle of water balance. Then, we reveal the trend of historical water inflows from the main water sources, and derive a residual period cost function as a quantitative description of the residual period water transfer cost. Finally, a two-stage decision-making model is constructed for different inflows, and a medium and long-term flow scheduling scheme is generated in a rolling manner. The results show that this two-stage model can overcome the adverse effects of medium and long-term forecast uncertainty on dispatching decision-making, and reduce the cost of water transfer significantly through adjusting mutual across multiple water sources and selecting water sources and transfer routes.

Key words: uncertainty, cross-basin water transfer, two-stage decision-making, medium and long-term scheduling, residual cost

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn