水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2020, Vol. 39 ›› Issue (12): 85-93.doi: 10.11660/slfdxb.20201208

• • 上一篇    下一篇

不同流量条件下弯曲河流颈口裁弯实验研究

  

  • 出版日期:2020-12-25 发布日期:2020-12-25

Experimental study on occurrence and processes of neck cutoff in meandering rivers under variable discharges

  • Online:2020-12-25 Published:2020-12-25

摘要: 颈口裁弯是弯曲河流演变过程的突变现象,其过程和机制尚未形成统一认识。本文采用室内水槽实验概化模型法,研究恒定流量和变化流量条件下裁弯前颈口缩窄过程、新河道形成及裁弯条件。结果表明,无论流量变化与否,颈口上、下游河岸的侵蚀是触发裁弯的主要因素。弯曲河流的模型河道的弯曲系数为6 ~ 7,颈口段宽度与河段河宽比值约0.43,河槽物质为非黏性沙,在单宽流量为0.0039 ~ 0.0069 m2/s,纵比降为1‰的条件下,经历足够长时间的河岸侵蚀后可发生颈口裁弯现象。裁弯即将发生时,连续河湾弯曲系数有所增加,河道的平面形态向下游发生旋转。颈口裁弯后,新河道形成经历以纵向冲刷为主、以横向展宽为主和缓慢发展三个阶段。

关键词: 弯曲河流, 颈口裁弯, 可变流量, 河岸侵蚀, 水位差

Abstract: Neck cutoff is a sudden change phenomenon occurring in the morphological evolution of meandering rivers, but its processes and mechanisms have not yet formed a unified consensus. To reproduce its occurrence and processes, the method of testing a natural model in a laboratory flume is used in this work to study its behaviors under constant and variable flow conditions–the channel evolution before and after cutting off, the formation of the new cutoff channel, and the cutoff threshold. Experimental results show that whether the river discharge varies or not, the main factor that causes the cut off is bank scour upstream and downstream of the neck. The well-developed model meandering rivers in the flume are regularly featured with a sinuosity range of 6-7, a width ratio (neck width to river channel width) of about 0.43, and a channel bed of non-sticky sand. Under the conditions of flow rates per unit width of 0.0039-0.0069 m2/s and a longitudinal riverbed slope of 1‰, neck cutoff can be triggered after long time scour on the river bank. Just before cutting off, the local sinuosity of successive river bay is increased, and the planar channel shape rotates downstream; after cutting off, the new cutoff channel experiences three stages of time evolution–longitudinal scour, horizontal broadening, and relatively slow development.

Key words: meandering river, neck cutoff, variable discharge, bank scour, water level difference

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn