高拱坝仓面施工时空冲突分析与调整方法研究

  

  • 出版日期:2017-05-25 发布日期:2017-05-25

Time-space conflict analysis and adjustment methods for pouring concrete of high arch dams

  • Online:2017-05-25 Published:2017-05-25

Abstract: To resolve the time-space conflicts in pouring concrete of high arch dams, this paper first analyzes the state transition of construction entities in a three-dimensional space, and develops a spatial-temporal evolution model and description method of the entities. Then, by the transition process, generation and classification of the conflicts and their effect are examined and a mechanism of space-time adjustment to the pouring procedure is established. Finally, a conflict detection mechanism is constructed using simulations of concrete pouring. We have achieved simulations of the pouring procedure in the virtual scene and developed an optimization model for dynamically adjusting the construction scheme. Application to a practical case of concrete pouring shows that this method can provide detailed data for a pouring procedure before its implementation and hence it would help analyze the feasibility and security of a construction scheme.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn