水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2017, Vol. 36 ›› Issue (2): 1-8.doi: 10.11660/slfdxb.20170201

• •    下一篇

特约论文:丹江口水库设计洪水复核及偏大原因分析

  

  • 出版日期:2017-02-25 发布日期:2017-02-25

Rational check of design floods for Danjiangkou Reservoir

  • Online:2017-02-25 Published:2017-02-25

Abstract: The dam site flood series of the Danjiangkou reservoir was extended up to 2014 and its greatest historical flood was verified in this study. We checked the design floods using a P3/CF model and P3/LM model separately and obtained a flood limiting water level (FLWL) through reservoir flood routing based on the design flood hydrograph calculated by the P3/CF model. The probable maximum floods were estimated using the envelop curves of the world greatest flood records and the paleofloods in the Hanjiang basin. This rational analysis shows that the historical textual period of the greatest flood occurring in the year 1583 could be extended to a period of 625 years. And by averaging the calculations of these two models, the 1000-year design flood peak and 7-day flood volume should be decreased by 10.4% and 13.3% respectively. Thus we recommend a design flood of 58000 m3/s, a check flood of 80500 m3/s, and an increase in FLWL by 2.0 m for this reservoir. This would significantly increase the comprehensive benefits while ensuring flood control safety of the reservoir.

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn